Commercial: Office

Project: IRIS CENTER OFFICES
  Client: City of Boulder, Parks and Recreation Department
    Boulder, CO 80304-2644
  Client Rep: Mr. Perry Brooks, RLA (303) 413-7226
  Description: Interior remodel of existing office space. Reconfiguring existing mechanical system/layout. New lighting throughout project.
  Budget/Schedule: TBD  
  General Contractor: TBD

Project: PEARL PARKWAY CENTRE
  Client: Pearl Parkway Centre, LLC
  Client Rep: Neil Littman/Scott Reichenberg
  Description: 57,000 SF three-story mixed-use industrial service center near developing Boulder Transit Village. First floor retail/restaurant, second/ third floor offices.
  Budget/Schedule: $7.1M/ Entitlement mid-2008, Occupancy 2009
  General Contractor: Weaver General Construction Co.

Project: McGREGOR ACTIVITY CENTER
  Client: Glenn Hagen – Good Shepherd Communities,
    5630 South Curtice Street, Littleton, CO 80120
  Client Rep: Glenn Hagen (303) 795-2061
  Description: Interior finish of an existing retail building to become a group activity center to include new offices, activity space, exercise area and a theater.
  Budget/Schedule: $568,000/January 2009  
  General Contractor: Golden Triangle Construction

Project: CARBON BUSINESS PARK
  Client: Mr. John De Filippi (303)859-5100
    1305 Pearl Street, Ste. 400, Boulder, CO 80302
  Description: 31,700 SF remodel of an existing warehouse into office condominiums.
  Budget/Schedule: TBD  
  General Contractor: TBD

Project: CLEAR CREEK POST OFFICE AND RETAIL BUILDING
  Client: City of Black Hawk
  Client Rep: Philo S. Shelton, P.E. (303)582-1324
  Description: New construction of two buildings: a 3,822 SF Post Office and a 4,908 SF Commercial Building. The buildings are designed to replicate a historic vernacular.
  Budget/Schedule: 2.7 million/ February 2006  
  General Contractor: White Construction

Project: FRESH PRODUCE CORPORATE OFFICES
  Client: Fresh Produce
    2885 Wilderness Place, Boulder, CO 80301
  Client Rep: Sean Sweet (303)444-7573
  Description: 19, 200 SF corporate office space for a clothing designer and retailer.
  Budget/Schedule: TBD / Completion date of Fall 2005  
  General Contractor: TBD

Project: CRESTONE OFFICE & GIFT PAVILION
  Client: Shumei International Institute
    3000 East Dream Way, Crestone, CO 81131
  Client Rep: Mr. Laurence Deutsch (760) 245-4023
  Description: 5,200 SF Office and Gift Pavilion for a self- sustainable religious facility on a 24-acre site. Facilities are integrated with natural surroundings and are constructed from insulated concrete forms and straw bale.
  Budget/Schedule: $1.5 million / Completion date of April 2005  
  General Contractor: Sprung Construction, Inc.

Project: SUDZ AUTOWASH
  Client: ITB Holdings, LLC
    5153 Grey Swallow Street Brighton, CO 80601
  Client Rep: Ms. Kelly Deal (303) 961-8855
  Description: 6,468 SF auto wash facility including automatic wash tunnel, two details bays and display/retail space. Utilizes reclaimed water system and Xeriscape.
  Budget/Schedule: $680,000/Summer 2005  
  General Contractor: Artisan Construction

Project: FORMULA 1 AUTOBARN
  Client: Confidential
    Evergreen, CO 80422
  Client Rep: Tom Sprung (303)293-2777
  Description: 25,650 SF addition to existing high-end vehicle storage facility.
  Budget/Schedule: $750,000/Summer 2005  
  General Contractor: Sprung Construction, Inc.

Project: GUIRY PAINT
  Client: BCL Architects
    1319 Spruce Street, Boulder, CO 80302
  Client Rep: Mr. Fred Cooper, AIA (303) 939-9851
  Description: Concept development schemes for the remodel of an existing downtown Denver warehouse into office condominiums.
  Budget/Schedule: TBD  
  General Contractor: TBD

Project: TOWN AND COUNTRY DISPOSAL
  Client: Waste Connections of Colorado
    2780 South Main Street Erie, CO 80516
  Client Rep: Mr. Jeff DeBruyne (303) 492-8484
  Description: 3,732 S.F. of renovated and new two-story office space consisting of multiple offices, Conference area, locker room, break room and reception area. Also includes site planning for 200 employee and truck parking, fuel island and lighting changes, new 70x50 transfer building and renovated vehicle service bays.
  Budget/Schedule: $450,000/TBD.  
  General Contractor: Artisan Construction

Project: CU PLANNING OFFICES
  Client: The Regents of the University of Colorado
    Facilities Management Boulder, CO 80309-0053
  Client Rep: Mr. Bill Sweeney
  Description: 600 SF tenant finish including new kitchen and casework, custom millwork and new finishes.
  Budget/Schedule: $10,000/ Completed February 2001.  
  General Contractor: Sun Construction and Design Services, Inc.

Project: FROGMAGIC OFFICES
  Client: Blue Mountain Arts
    2905 Wilderness Place Boulder, CO 80301
  Client Rep: Mr. Robert Gall
  Description: 2,880 SF tenant finish for dot-com businesses. Custom features and millwork and coordination of mechanical, plumbing and electrical.
  Budget/Schedule: $130,000/ Completed May 2001.  
  General Contractor: RKB Construction, Inc.

Project: MUNICIPAL MAINTENANCE SHOPS
  Client: City of Black Hawk Public Works
    196 Clear Creek Black Hawk, CO 80422
  Client Rep: Mr. Philo S. Shelton (303) 582-1324
  Description: Master planning for a 10.8 acre site and 19,800 S.F. pre-engineered metal building containing nine drive-thru vehicle bays, departmental offices, meeting facilities and employee locker rooms.
  Budget/Schedule: Programming complete.  
  General Contractor: TBD

Project: HIGH-TECH CONFERENCE CENTER ADDITION
  Client: Millennium Harvest House Hotel
    1345 28th Street Boulder, CO 80302
  Client Rep: Mr. William Zollars (303) 443-3850
  Description: 13,200 S.F. second story addition to one story section of existing hotel on 15.8-acre site. Restriping of existing parking lot to comply with latest city codes. Landscape enhancements and improved connection to adjacent street and nearby creek path.
  Budget/Schedule: Schematic Design complete.  
  General Contractor: TBD

Project: REGIONAL RESEARCH AND MANUFACTURING FACILITY
  Client: Granville-Phillips Helix Technology Corporation
    6450 Dry Creek Parkway, Boulder, CO 80301
  Client Rep: Mr. Jerry Howard
  Description: 59,500 S.F. two-story tenant finish. Includes custom-designed public spaces with built-ins, clean room manufacturing, and open-office landscape.
  Budget/Schedule: $2.08 Million/ Completed April 2000.  
  General Contractor: Wyatt Construction Co. Inc.

Project: COMMUNICATIONS ROOM – WING 1
  Client: NIST
    325 Broadway Boulder, CO 80303
  Client Rep: Mr. Joe Denfeld (303) 497-5663
  Description: Renovation of main communications location including mechanical and lighting upgrades.
  Budget/Schedule: $22,000/Completed January 1999.
  General Contractor: By Owner.

Project: ARC CORPORATE HEADQUARTERS
  Client: Architectural Resource Consultants Inc.
    1319 Spruce Street, Boulder, CO 80302
  Client Rep: Mr. Christopher J. Squadra
  Description: 1,300 SF tenant finish for professional offices, including custom millwork and historic details.
  Budget/Schedule: $39,000/Completed February 1999.
  General Contractor: Gardner Construction Inc.

Project: SPRUCE STREET PROFESSIONAL CENTER
  Client: Spruce Street LLC
    1942 Broadway, Boulder, CO 80302
  Client Rep: Mr. Paul Eklund
  Description: Customized interior package for a 9,800 SF historic two-story renovated office building, including tenant finish documents for two major tenants.
  Budget/Schedule: $136,000/Completed March 1999.
  General Contractor: Gardner Construction Inc.


Project: BOULDER FRUIT EXPRESS OFFICES
  Client: Boulder Fruit Express
    340 S. Taylor Street Louisville, CO 80027
  Client Rep: Mr. Jeff Markel (303) 666-4242
  Description: 4,500 SF addition to existing warehouse and a new 15,000 S.F. steel frame research & development office building in the Colorado Technical Center.
  Budget/Schedule: $2.1 Million/On Hold.
  General Contractor: Walker Construction Management Inc.

Project: 1800 BROADWAY OFFICE
  Client: Vail Commons Partnership
    1942 Broadway, Boulder, CO 80302
  Client Rep: Mr. Paul Eklund
  Description: 63,428 SF three-story building. ADA and life safety upgrades, including acoustical treatments for new tenants, exterior balcony and landscape treatments.
  Budget/Schedule: $78,800/Completed December 1999
  General Contractor: Deneuve Construction Services Inc.

Project: STUDIO FOR PEH ARCHITECTS
  Client: PEH ARCHITECTS
    1319 Spruce Street, Boulder, CO 80302
  Client Rep: Mr. Peter Heinz AIA
  Description: 980 SF tenant finish for architect offices, including custom features, indirect lighting and upgraded casework.
  Budget/Schedule: $35,400/Completed October 1998
  General Contractor: Gardner Construction Inc.

Project: PEARL AT GOOSE CREEK
  Client: Hast & Company
    525 Canyon Boulevard Boulder CO 80302
  Client Rep:  Mr. Tom Hast
  Description:  Major Planning for a 1.5 acre site containing two commercial pad buildings of approx. 45,000 SF including highway truck loading and automobile parking.
  Budget/Schedule:  $163,000/Master Planning Complete  
  General Contractor:  N/A

Project: 1319 SPRUCE STREET INTERIORS
  Client: Spruce Street LLC
    1942 Broadway Boulder CO 80302
  Client Rep: Mr. Paul Eklund
  Description:  Customize interior package for a 9,800 SF 2 story renovated office building, including tenant finish documents for two major tenants.
  Budget/Schedule:  $136,000/Completed March 1998.  
  General Contractor: Gardner Construction , Inc.

Project: YMCA
  Client: YMCA of Boulder County
    Facilities Management
    Boulder CO 80309-0053
  Client Rep: Mr. Spencer Hepp
  Description:  14,880 SF renovation of updating per ADA-new entrance courtyard and disabled restrooms; transforming handball courts to aerobics room. 1,980 SF addition of cardiovascular room.
  Budget/Schedule:  $380,000/Completed Augut 1998.  
  General Contractor:  Sun Construction and Design Services, Inc.

Project: QUALCOMM CAMPUS PLAN - Boulder, CO
  Client: QUALCOMM Inc.
    6455 Lusk Boulevard San Diego, CA 92121
  Client Rep: Mr. Charles Nichols, Director of Construction
  Description:  72,700 SF three story office and one story research building. Entitlement services include coordination with multiple city building permits, adjacent site telecommunication needs and water feature in fully landscaped courtyards.
  Budget/Schedule:  $4.36 Million/Completed December 1998.  
  General Contractor:  Wyatt Construction Co. Inc.

Project: HUMAN SERVICES @ FACMAN
  Client: The Regents of the University of Colorado
    Facilities Management
    Boulder CO 80309-0053
  Client Rep: Mr. Tim Mangina
  Description:  2,370 SF renovation and 500 SF addition to Folsom Stadium including new offices, shop space and employee lounge.
  Budget/Schedule: $305,000/Completed June 1997  
  General Contractor: Sun Construction and Design Services, Inc.

Project: ALVENUS PROFESSIONAL OFFICE
  Client: C & P Investments Inc.
    240 Mohawk Drive Boulder, CO 80303
  Client Rep: Mr. Paul Brooks
  Description: 15,000 SF two-story professional office building, utilizing exterior entrances and landscaped courtyards.
  Budget/Schedule: $925,000/Completed June 1995.  
  General Contractor: Redwood Builders Inc.

Project: MESA OFFICE COMMONS
  Client: Pelz Limited Liability Corp.
    535 Mapleton Avenue, Boulder, CO 80304
  Client Rep: Mr. Robert Pelz/Mr. Chris Squadra
  Description: 10,310 SF Two story specialty offices with retail shops below, situated on a view mesa in south Boulder. Master plan includes additional 15,000 SF of development for parking, office, and retail.
  Budget/Schedule: $760,000/ Completed September 1995.  
  General Contractor: Taylor Ball of Colorado Inc.

Project: KITCHEN RENOVATION
  Client:  Frasier Meadows Manor Inc.
    350 Ponca Place Boulder, CO 80303
  Client Rep: Ms. Jeri Rowley, Executive Director (303) 499-4888
  Description: Retrofit of mechanical system for heat evacuation, makeup air and exhaust requirements. Life safety, roof loading and continuous operation issues.
  Budget/Schedule: $68,000/Completed August 1994.  
  General Contractor: Helm Corporation

Project: DEPARTMENT OF COMMUNICATIONS
  Client:  The Regents of the University of Colorado
    Facilities Management
    Boulder CO 80309-0053
  Client Rep: Mr. Erik van de Boogaard/Dean Jane Lillydahhl
  Description: 14,200 SF renovation and upgrade century old building to modern, 1st class office and meeting spaces. Life safety analysis. Open furnishings plan.
  Budget/Schedule: $174,500/Completed February 1993.  
  General Contractor: Taylor Ball of Colorado, Inc.

Project: HIGH COUNTRY PROFESSIONAL BUILDING
  Client: Mr. Glenn T. Hoynoski P.E.
    163 Beethoven Dr. Golden CO 80403
  Client Rep: Mr. Glenn T. Hoynoski
  Description: 6,000 SF 2 story wood frame office building with shared receptionist area and multi-tenant spaces. Sensitive integration with high altitude environment/landscape.
  Budget/Schedule: $250,000/Completed June 1993.  
  General Contractor: Owner build.

Project: BUSINESS TICKET OFFICE
  Client:  The Regents of the University of Colorado
    Facilities Management
    Boulder CO 80309-0053
  Client Rep: Mr. Gil Fike/Mr. John Krueger
  Description: 4200 renovation of existing ticket sales offices to include new public ticket lobby and built-ins, open plan furniture, communication system upgrades.
  Budget/Schedule: $175,000/Completed August 1993.  
  General Contractor: Valle del Rio Co. Inc.

Project: CHEVRON BUILDING @ FIDDLER’S GREEN
  Client: Engineering Economics Inc.
    700 Simms Street Denver, CO 80401
  Client Rep: Mr. Paul Seward (303) 239-8700
  Description: 250 SF boiler room addition for partial electric to gas heating conversions, integrated with existing building appearance, codes and systems. Continuance of occupancy.
  Budget/Schedule: $340,000/Completed September 1993.  
  General Contractor: Western Building Services

Project: EATON CONFERENCE SUITE
  Client: The Regents of the University of Colorado
    Facilities Management
    Boulder CO 80309-0053
  Client Rep: Mr. Robert Stolte/Dr. Robert Culp
  Description: 1,200 SF remodel into "state of the art" audio visual conference room with "break-out" room. Includes custom built-in AV spaces, furniture and finishes.
  Budget/Schedule: $125,000/Completed February 1992.  
  General Contractor: J.C. Brooks & Co. Inc.

Project: LAKE VALLEY SUBSTATION
  Client: Boulder Rural Fire Protection District
    P.O. Box 18286 Boulder, CO 80308
  Client Rep: Mr. Ray Johnson, President Board of Directors (303) 449-1616
  Description: 1,600 SF two-apparatus bay, rural fire station. Includes extensive site development and coordination with neighborhood.
  Budget/Schedule: $110,000/Completed August 1992.  
  General Contractor: KMH Construction, Inc.

Project: ECO-CYCLE RECYCLING CENTER
  Client: Eco-Cycle Community-Based Recycling
    5030 Pearl Street Boulder CO 80302
  Client Rep: Mr. Eric Lombardi, Executive Director
  Description: Construction Documents for an addition of a paper-sorting conveyor and related site work to accommodate additional vehicles.
  Budget/Schedule: $40,000/Completed April 1991.  
  General Contractor: By Owner.

Project: MASS MEDIA PROJECT
  Client: The Regents of the University of Colorado
    Facilities Management
    Boulder, CO 80309-0053
  Client Rep: Mr. Donald Milkovich/Mr. Steve Jones
  Description: 3,300 SF on 4th floor Norlin Library, remodel into office/conference and presentation space for Journalism Dept.
  Budget/Schedule: $100,000/Completed January 1989.  
  General Contractor: Taylor Ball of Colorado, Inc. (Ringland/Johnson/Crowley Inc.)

Project: FIRESTATION NO. 2
  Client: Louisville Fire Protection District
    P.O. Box 85 Louisville, CO 80027
  Client Rep: Mr. Chuck Schmidt, Chief (303) 673-7826
  Description: 2,600 SF of 4 stall service bay, 5300 SF facility consisting of 2,700 SF of offices and coordination with Flight for Life.
  Budget/Schedule: $325,000/Completed September 1988.  
  General Contractor: Fischer Construction Co. Inc.

Project: ENGINEERING ADMINISTRATION OFFICES
  Client: The Regents of the University of Colorado
    Facilities Management
    Boulder, CO 80309-0053
  Client Rep: Facilities Management, Boulder, CO 80309-0053
  Description: 1,500 SF remodel for conference/multi purpose presentation room with operable walls, storage and handicap bathroom.
  Budget/Schedule: $25,000/Completed September 1988.  
  General Contractor: Sun Construction Services Inc.

Project: 2235 BROADWAY BUILDING
  Client: Mr. Donald M. Wilson
    P.O. Box 1046 Boulder, CO 80306
  Client Rep: Mr. Donald M. Wilson
  Description: 2,500 SF remodel and renovate new law offices to include custom built-ins, etched glass panels, tenant finish and site work.
  Budget/Schedule: $150,000/Completed November 1987.
  General Contractor: Kelso Construction Co. Inc.

Commercial: Medical

Project: HUSKEY DENTAL
  Client: Mr. David Huskey, DDS
  Client Rep: Mr. Mark Wheeler (303) 469-6375
  Description: Remodel of existing second floor space to accommodate new dental office.
  Budget/Schedule: TBD
  General Contractor: TBD

Project: WHEELER DENTAL
  Client: Dr. Wheeler, DMD.
    SCI Professional Building Louisville, CO
  Client Rep: Mr. Mark Wheeler (303) 469-6375
  Description: 1,240 SF dental suite including reception/waiting area.
  Budget/Schedule: $140,000/ Completed June 1998.
  General Contractor: Redwood Builders Inc

Project: EMPLOYEE HEALTH AND SPECIALTY CLINIC
  Client: The Regents of the University of Colorado
    Facilities Management
    Boulder CO 80309-0053
  Client Rep: Mr. Michael Barden/Mr. Sam Makris
  Description: Renovation of third floor, including new ceilings, partitions, doors, finishes and fully coordinated mechanical, fire protection and electrical.
  Budget/Schedule:  $100,000/ Completed October 1996.  
  General Contractor: Sun Construction & Design

Project: HANSON DENTAL CLINIC
  Client: Dr. Russell H. Hanson, DDS
    SCI Professional Building Louisville, CO 80027
  Client Rep: Mr. Russ Hanson
  Description: 1,740 SF dental suite including exterior employee lounge.
  Budget/Schedule: $175,000/Completed October 1996  
  General Contractor: Redwood Builders Inc.


Project: JARRETT DENTAL OFFICE
  Client: Dr. Charles D. Jarrett, DMD
    1371 Hecla Drive Louisville, CO 80027
  Client Rep: Mr. Charles Jarrett
  Description: 1,757 SF tenant finish for Dentist. High end custom built-ins, including recessed AV equipment.
  Budget/Schedule: $175,000/Completed September 1996.  
  General Contractor: Redwood Builders Inc.


Project:  FUKAI ASSOCIATES - OPTOMETRISTS
  Client: Fukai and Associates
    1371 Hecla Drive Louisville, CO 80027
  Client Rep: Mr. Mike Fukai
  Description: 3,200 SF tenant finish for Optometrist. High end custom design including extensive built-in furnishings, exam/surgery rooms, and employee lounge.
  Budget/Schedule: $85,000/Completed August 1995.  
  General Contractor: Redwood Builders Inc.

Project: HUNT PHYSICAL THERAPY CLINIC
  Client: ATC and Associates
    1021 S. Boulder Road Louisville, CO 80027
  Client Rep: Ms. Karen Hunt
  Description: 1,800 SF tenant finish for sports therapy specialist. Includes locker rooms, therapy room, open space for rehabilitation equipment.
  Budget/Schedule: $65,000/Completed December 1995.  
  General Contractor: Redwood Builders

Project: PORTER MEDICAL
  Client: In Site Properties Inc.
  Client Rep: Mark Holmes (303) 939-9851
  Description: Ongoing interior remodel of existing medical office facility. Tenant finish for medical suites of 1,400 SF for a lasik eye surgeon and 2,200 sf for a physical therapist.
  Budget/Schedule: $40/SF / Ongoing
  General Contractor: To be determined.

Project: WARDENBURG HEALTH CARE CENTER RENOVATION
  Client: The Regents of the University of Colorado
    Facilities Management
    Boulder CO 80309-0053
  Client Rep: Mr. Michael Barden/Mr. Sam Makris
  Description: Feasibility Study
  Budget/Schedule: $926,000/ Feasibility Study Complete.
  General Contractor: N/A

Project:  FORTINO ASSISTED LIVING
  PUEBLO, COLORADO
  Client: Regent Assisted Living Inc.
    121 SW Morrison, Suite 1000 Portland, OR 97204
  Client Rep: Mr. James Ekberg, Senior Vice President of Finance and Development
  Description: Master Planning and Design Services for a 2.73 acre site that contains 50 assisted living units and 20 alzheimer units.
  Budget/Schedule: $3.46 Million/Entitlement and Schematic Design complete.  
  General Contractor: N/A

Project: SAN BERNADINO ASSISTED LIVING
  REDLANDS, CALIFORNIA
  Client: Regent Assisted Living Inc.
    121 SW Morrison, Suite 1000 Portland, OR 97204
  Client Rep: Ms. Nancy Hubbard, Project Manager for Development
  Description: Master Planning and Design Services for a 5.29 acre site that contains 89 assisted living units in a two-story configuration and 24 alzheimer units in a one story building. Additionally, the site contains 4 duplex cottages.
  Budget/Schedule: Entitlement and Schematic Design complete.  
  General Contractor: N/A